342
... to the Praya and which I am informed were very heavy. The Sea wall between the Harbor Master's Office and Centre Street has been more or less injured so much that I consider it will be a waste of money to attempt again to repair it...
I have roughly estimated the cost of rebuilding a substantial Sea Wall on the same site as the old one at $50,000.
His Excellency is however, aware that Tenders for a New Sea Wall between the Harbor Master's Office and M Lot 37 to be constructed by the Tenants, are under consideration, and that it is also proposed to build a new wall between M. Lot 37 and 200. It is a matter for consideration whether these schemes which cannot now be much longer delayed should not be considered in connection with a still further extension Westwards giving the Tenants a depth of 100 feet in consideration of their bearing the expense of the new wall and...
342
زمه
En
to the Praya and which
I
arru
informed
Avere
here
very heavy. The Seaya
wall between the Harbor,
Master's Office and Centre
Street has been all more or less injured so much
00
that I consider it will
be maste of money
too
attempt again to repaiz
it...
I
c
roughly Estimate
the Cost of rebuilding
a
am
substantial Sea Nail
the same site
old
one
کر تم سے
at $50,000
the
His Excellency is however,
awone
that Tenders for
a New Sea Wall between
the Harbor Master's Office
nstructed
and M Lot 37 to be cons
by the Tenants,
ская изгорит
under considuation, and
that it is also proposed
to Build
new-wall between
M. Lot 37 s. and 200. It is
a matter for consideration
whether these schemes which
cannot now be much
longer delayed should not.
be considered in connection
with
a still further extension
Westwards giving the
Tenants a
depth of 100
feet in considuation of
their bearing the
expense
of the new wall and
No comments yet.
Private notes are available after approval.